Debris clearance continues at the Kyiv HPP after the attack: the latest news from Ukrhydroenergo

At the Kyiv HPP, where a missile attack recently took place, work on the demolition of debris is still ongoing. General director of the company "Ukrhydroenergo" Ihor Syrota reported on the current situation at the facility on the air of the telethon.

"It is not yet possible to estimate all the technical consequences and the time required to repair the damage," Sirota added. According to him, there is no threat of a breach of the dam of the Kyiv HPP and flooding of the territories.

He also informed that today there is not a single Ukrhydroenergo station that has not been damaged. About 130 strikes were made at the HPP. Currently, DniproHES is not working, other stations are in the process of restoration.

In general, "Ukrhydroenergo" lost more than 40% of its generation.

spot_imgspot_imgspot_imgspot_img

popular

Share this post:

More like this
HERE

Ukraine is taking "unconventional measures" to avoid an energy crisis this winter

Ukraine is preparing for another difficult winter, overcoming the consequences of Russian...

Trump called on Zelensky to end the war without returning the occupied territories

US President-elect Donald sent a clear signal to the President of Ukraine...

Russian troops shot Ukrainian prisoners: five soldiers died

The Russian occupiers once again committed a war crime, brutally massacred...

A record number of border crossings on the eve of Christmas: 150,000 people per day

The pre-Christmas period in Ukraine became a time of active migration flows....

What can not be given for the New Year: gifts with negative energy

The New Year is a holiday that symbolizes new beginnings,...

In Volyn, a man was sentenced for spreading information about the TCC's mobilization activities

In the Volyn region, a man who led a group in...